2025 Block Making Machine Procurement Guide: 3 Dimensions to Avoid Pitfalls

                           2025 Block Making Machine Procurement Guide: 3 Dimensions to Avoid Pitfalls

I. Technical Adaptability
When selecting machines, we need to accurately match engineering requirements to avoid "functional redundancy" or "insufficient performance."

1. Intelligent and Flexible Production Capabilities: Benchmark equipment in 2025 will no longer be simple machinery. The focus will be on whether it possesses functions such as "one-click mold change," cloud-based formula data management, and intelligent production line scheduling. This directly determines your ability to quickly respond to market demands for small-batch, multi-specification customized building blocks, achieving an upgrade from "standardized production" to "flexible manufacturing."

2. Energy Consumption and Environmental Compliance: Under the pressure of "dual carbon" (carbon dioxide, carbon emissions, and carbon emissions), the energy consumption level of equipment directly affects operating costs and the factory's ESG rating. Prioritize energy-saving models using servo motors and waste heat recovery systems. Simultaneously, ensure that dust and noise emissions comply with increasingly stringent national and local environmental regulations to avoid the risk of forced production shutdowns and modifications due to non-compliance with environmental standards.

Key Points to Avoid: Do not blindly trust sales promises. Visit existing customer factories to observe the equipment's operational stability, yield rate, and automation level under real-world conditions, especially its performance during night shifts or high-load production.

II. Supplier Reliability

Block making machines are long-term assets, and the value of a supplier extends far beyond a one-time sale. Therefore, choosing a reliable brick machine manufacturer is the foundation for long-term cooperation.

1. Verify Company Qualifications and Industry Standing: Prioritize "High-Tech Enterprises" and "Circular Economy Demonstration Units": These companies typically possess technological expertise and stable quality.

Beware of "low-price traps" and "OEM manufacturing": Some small factories compete on price, but their equipment failure rates are high, and their after-sales response is slow.

2. Full Lifecycle Service Capabilities: Examine the supplier's service roadmap: Does it provide one-stop service from factory planning, equipment installation, personnel training, production support to spare parts supply and remote diagnostics? By 2025, leading suppliers could use AR remote assistance to guide on-site workers in troubleshooting within minutes, greatly reducing downtime losses.

3. Localized Support and Response Speed: The equipment's "capacity" does not equal your "output." In the event of a malfunction, the supplier's response speed is crucial. Clearly define the distance to their service outlets and the location of their spare parts warehouses, and stipulate in the contract terms such as maximum response time and guarantee of supply for critical spare parts to ensure service commitments are fulfilled.

Key points to avoid pitfalls: Before final negotiations, personally visit 1-2 of the supplier's customers to understand the long-term reliability of their equipment and the actual fulfillment of their service commitments.

III. Total Life Cycle Cost

We need to consider the purchase price and operating costs of equipment to maximize overall benefits.

1. Purchase Cost ≠ Total Cost of Ownership:

Your total cost should include: equipment price + installation and commissioning fees + energy consumption costs + daily maintenance costs + spare parts depreciation costs + potential downtime losses + residual value disposal. A low-priced but energy-intensive and frequently malfunctioning piece of equipment may have a total cost of ownership far exceeding that of a high-quality piece of equipment within 3 years.

2. Quantifying "Efficiency Costs": Calculate the gap between the theoretical capacity and the actual stable capacity of the equipment. Equipment that, due to complex commissioning and frequent malfunctions, only achieves 70% of its theoretical capacity in actual production, incurs capacity losses and opportunity costs that must be included as "efficiency costs."

Key Points to Avoid: Request a detailed "Total Life Cycle Cost Analysis and Calculation Table" from the supplier, and conduct simulation calculations based on your local industrial electricity prices, labor costs, and expected production volumes to provide a clear overview of long-term costs.

When purchasing block making machines, it's essential to "check qualifications, calculate costs, and verify performance" to accurately match needs and avoid procurement pitfalls. Choosing the right equipment not only reduces construction costs but also prevents potential problems such as "later wall cracks and insulation failure," laying a solid foundation for project success.

Connect us for more Details

WhatsApp17759317035

Emailyx06@blockmachine.cc

prev
yixin new technology concrete block machine attend 2024 shanghai Bauma Expo
China's Block Making Machine Exports to South Africa: Policy and Demand Analysis
next
recommended for you
no data
GET IN TOUCH WITH Us
Customer service
detect